Lead image for the Home page

Bitumen is a triple threat

Every road is held together by bitumen — the residue left when crude oil has been refined into everything more valuable.

Price-volatile, supply-insecure, carbon-intensive, and without a scalable alternative.

  • ~530 kg CO₂e

    per tonne, primarily sourced from heavy crude in the Persian Gulf, Venezuela, the Gulf of Mexico, and Russia -- regions with elevated geopolitical risk.

  • > 2 billion tonnes

    of bituminous asphalt every year. That's a Great Pyramid of Giza in asphalt built every single day, all year round.

  • ~ 25 million miles

    of paved road worldwide to maintain — enough to go to the Moon and back 50 times.

Congestion from supply shock

The supply shock arrives before the carbon deadline

Demand is rising while the refineries that make bitumen close: 34 across the US and EU shut or converted between 2009 and 2021.

The critical issue is bitumen supply's downward trajectory with no alternative binder currently available that's capable of achieving such scale.

  • Downward Trend Bars

    8~15% a year

    The natural decline rate of oil production.

    IEA, The Implication of Oil and Gas Field Decline Rates, 2025; ExxonMobil, Global Outlook to 2050, 2024

  • Hike in prices (testing)

    +400%

    The price rise with permanent 15%-a-year supply loss.

    ExxonMobil, Sensitivity Analysis — Global Outlook to 2050, 2024

  • Downward trajectory

    ↓ 20%

    Estimated reduction of Europe's bitumen production capacity by 2035.

    S&P Global

A multifunctional bio-binder made from waste sulfur and natural oils

Mounds of sulfur as industrial byproduct and waste

Uberbinder is built on two of the planet's most abundant materials — waste sulfur and natural fatty acids — brought together by our patented process into one binder that does the work of several. It is designed to be interoperable, cost-competitive with profit uplift, and is intended to be licensed into the supply chain you already use.

See how it works →

Achieving Net Zero: Key levers for 2030–2040

The asphalt sector named five key levers to achieve Net Zero. Our chemistry is designed to address four in a single binder.

1–3 of 51 / 5

  • 1

    Uberbinder's bio-binder specimen

    Bio-binders

    to reduce our reliance on fossil binders; this emerging solution to become commercially viable and drive significant additional reductions throughout 2030–2040.

  • 2

    Sample of Warm Mix Asphalt

    Warm Mix Asphalt (WMA)

    already becoming the industry default, WMA must represent over 80% of the total asphalt we lay by 2030 to reduce energy and fumes.

  • 3

    Road surface of Waltham Trial

    Long-life materials

    durable pavement solutions designed to withstand growing climate stressors and reduce the frequency of future maintenance.

Momentum

Uberbinder science team at the Materials Innovation Factory
  1. Patents granted in key markets. (done)
  2. First field pilot laid in 2025, and through its first winter. (done)
  3. Independent validation underway with an international engineering consultancy. (done)
  4. Field trials booked with road authorities in the UK and Spain for 2027. (done)
  5. A route to industrial scale being independently assessed. (done)
Uberbinder science team at the Materials Innovation Factory

Progress and industry recognition

Pioneering sustainable material science

If you specify, produce or supply binder, follow our progress or get in touch to explore a collaboration.

TEsting